C-48731 - Design Build Services for Structural Improvements on The 8th Avenue Line

  • Communication risers (logical), wiring diagrams
  • Technical Expert for field testing and communication drawing sign-off
  • Field surveys to assist with installation plans and drawings
  • Furnish fiber/copper testing procedures and reports
  • Fabricate Telephone Terminal Board
  • Certification of Fiber Optic cables and Multi copper cables

C-52163 | C-52164 | C-52165 | C-52166 | C-52168 | C-52169 | C-52170 | C-52171 - Passenger ID CCTV System (Multiple Stations)

  • Configuration of Network Switches and CCTV Cameras
  • Perform Pre and Post Field of View procedures
  • Certification of Fiber Optic cables and CAT6 copper cables
  • Execute Network SAT and SIT procedures

E-30641 - Replacement of 17 Escalators at 6 Stations Systemwide

  • Pre-Cutover testing and post cut-over testing
  • Communication risers (logical), wiring diagrams
  • Technical Expert for field testing and communication drawing sign-off
  • Field surveys to assist with installation plans and drawings
  • Integrate new and existing devices into PSLAN and Network Systems
  • Furnish fiber/copper testing procedures and reports
  • Furnish FAT/SAT procedures and reports
  • Custom security system manual

E-30645 - Design-Build Services For Replacement Of 6 Escalators At 2 Stations

  • Pre-Cutover testing and post cut-over testing.
  • Communication risers (logical), wiring diagrams and cable certifications.
  • Technical Expert for field testing and communication drawing sign-off.
  • Field surveys to assist with installation plans and drawings.
  • Integrate new and existing devices into PSLAN/CCTV and Network Systems.
  • Furnish field of view and fiber/copper testing procedures and reports.
  • Furnish FAT/SAT procedures and reports.
  • Custom security system manual

P-36317 - Construction of New West 28th Street Substation

  • Pre-Cutover Network testing and post cut-over Network testing
  • Communication risers (logical), wiring diagrams and cable certifications.
  • Technical Expert for field testing and communication drawing sign-off.
  • Field surveys to assist with installation plans and drawings.
  • Integrate new devices into existing Network Systems.
  • Furnish fiber/copper testing procedures and reports.
  • Furnish FAT/SAT procedures and reports
  • Provided OEM manual for Network Systems.

P-36708 - Construction of New Canal Street Substation on the 8TH Avenue Line, in the Borough of Manhattan

  • Pre-Cutover Network testing and post cut-over Network testing
  • Communication risers (logical), wiring diagrams and cable certifications.
  • Technical Expert for field testing and communication drawing sign-off.
  • Field surveys to assist with installation plans and drawings.
  • Integrate new devices into existing Network Systems.
  • Furnish fiber/copper testing procedures and reports.
  • Furnish FAT/SAT procedures and reports
  • Provide OEM manual for Network Systems.

P-36719 - 82nd Road Substation Renewal, 13th Street Substation Renewal, and High-Tension Switchgear Replacement at Seeley Substation

  • Built custom Data cabinets per location

  • Communication risers (logical), wiring diagrams and cable certifications

  • Technical Expert for field testing and communication drawing sign-off.

  • Field surveys to assist with installation plans and drawings.

  • Integrate new devices into existing Network Systems.

  • Furnish fiber/copper testing procedures and reports.

  • Furnish FAT/SAT procedures and reports

  • Provided OEM manual for Network Systems.

QM-36 - Design-build Services for Relocation of QMT Refueling Station and QSB Switchgear

  • Communication risers (logical), wiring diagrams and cable certifications.
  • Field surveys to assist general contractor.
  • Network Integration Support.
  • Furnish fiber/copper testing procedures and reports.
  • Furnish FAT/SAT procedures and reportsProvide OEM manual for Network Systems.

Previous Projects

LIRR 6240 3rd Track - 5 Stations

A-37150D - Livonia

E-34025R - Elevators GCT

C-43751 - Power and HVAC Upgrade at PCC RCC

P-36444 - Rutgers Tube Rehabilitation

QM-81 - Rehabilitation of Tunnel Controls and Communications System at QMT and HCT

CS-179 - East Side Access

S-33932 - Life Cycle Replacement Code System Phase I

E-30512 - Replace Escalators

LIRR - 3rd Track Temporary WiFI

P-80692 - Tottenville Substation

MNR 58050 - CSI Package